Waters Avenue Force Main Replacement CEI Services

Active RPS-26-00423 RFPArchitecture & EngineeringHillsborough County
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Hillsborough County (Florida) posted this RFP on Oct 22, 2026. Responses are due Dec 4, 2026. Category: Architecture & Engineering. Solicitation number RPS-26-00423.

Solicitation details

General information

Solicitation number
RPS-26-00423
Notice type
RFP
Place of performance
Florida

Agency and category

Agency
Hillsborough County
Category
007Architecture & Engineering
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The County is seeking to procure a Consultant to provide Construction Engineering and Inspection (CEI) services for the Waters Avenue Force Main Replacement. The project is being delivered using the Progressive Design-Build (PDB) delivery method and is currently underway, with project components at various stages of design and permitting. The project scope includes construction of approximately four (4) miles of 24-inch diameter Wastewater Pipeline and connecting existing County and Private Force Mains into the new system. The project is located along Waters Avenue, from Manhattan Avenue to Sheldon Road intersections.

Scope

The Consultant will provide general construction administration and construction observation services for the Waters Avenue Force Main Replacement. The Consultant may also support project controls, monitoring, and reporting. The purpose of construction observation is to confirm the PDB’s compliance with the contract documents.

The Consultant will provide technical personnel to administer CEI services for the project and related activities as requested to assist the County’s Project Manager. The Consultant will provide all necessary vehicles, equipment and personnel to perform the services required.

Construction Observation

The Consultant will provide qualified personnel to perform on-site observation of construction activities. Services will include, but are not limited to, the following activities:

  • Observe daily construction activities and complete daily reports (to be submitted to the County’s Construction Manager daily before the start of the next business day) summarizing work, observations, weather conditions, active equipment, construction staff, PDB non-conformance notices, concerns related to contract compliance, and other information for the Project Record.
  • Maintain regular coordination with the PDB Team’s Quality Control Manager and monitor the PDB Team’s QA/QC activities.
  • Provide monthly quantity resolution with pipe superintendent and checks of Project As-Built/Record Drawings relative to work completion and approved changes.

General Contract Administration Support

The Consultant will provide qualified personnel that will perform contract compliance monitoring, change management support, and associated construction administration duties, including contract administration, coordination and meetings, pay application review support, schedule monitoring, reports, equipment and materials logs, work zone requirements, pump station assistance, and closeout and warranty support. [...]

The Consultant shall be responsible for keeping the County’s Project Manager informed of all significant activities, decisions, correspondence, reports and other communications related to the responsibilities under this Scope of Services.

Additional information

The County reserves the right to modify the scope at any time, including adding, reducing or revising the services described herein.

In connection with this solicitation and its resulting Contract, a goal of 10% has been established for participation by SBE as Subcontractors.

The estimated project construction completion date is late 2028.

Documents

20 files

Sign up free to get these 20 documents.

  • 1. RPS 26-00423 Contract Terms and Conditions.pdf
    Download
  • AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx
    Download
  • Agreement - Professional Services Stand Alone.pdf
    Download
  • Attachment A CEI Scope of Work Waters Avenue Force Main Replacement.pdf
    Download
  • Attachment B CIP 10323 Waters Ave FM 60% Drawings.pdf
    Download
  • Attachment C CIP 10323 Waters Ave FM 60% Schedule.pdf
    Download
  • Attachment D CIP 10323 Waters Ave FM 60% Technical Specs.pdf
    Download
  • Attachment E CIP 10323 Waters Ave FM Final BODR.pdf
    Download
  • Attachment F Waters Ave FM Map.pdf
    Download
  • Attachment G Insurance Requirements.pdf
    Download
  • Direct Deposit Authorization Form 5.15.2025.pdf.pdf
    Download
  • Drug Free Workplace Form.doc.doc
    Download
  • Evaluation Criteria.pdf
    Download
  • Firm Data Sheet and Requested Criteria for Firm’s Experience.docx.docx
    Download
  • Insurance Certificate.doc.doc
    Download
  • Request For Bonus Points SBE-2 Form (FINAL Rev 08.2026).pdf
    Download
  • Request for Bonus Points Tutorial (SBE Division v4).mp4
    Download
  • Standard Form 330 Part II.pdf.pdf
    Download
  • Subcontractor Letter of Intent .pdf
    Download
  • Substitute W9 Form.pdf.pdf
    Download

Similar open bids

In Florida

More from Hillsborough County

Open bids