Carver High School New School of Arts Modification and Renovations

Active 2027-0001 RFPConstruction - BuildingAtlanta Public Schools
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Atlanta Public Schools (Georgia) posted this RFP on Nov 2, 2026. Responses are due Nov 18, 2026. Category: Construction - Building. Solicitation number 2027-0001.

Solicitation details

General information

Solicitation number
2027-0001
Notice type
RFP
Place of performance
Georgia

Agency and category

Agency
Atlanta Public Schools
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Atlanta Independent School System is seeking a Construction Manager at Risk (CMAR) to provide preconstruction and construction services at Carver High School. The project includes renovations and modifications for a new school of Arts.

Owner intends to develop and construct the Project and to retain Construction Manager to (1) provide pre-construction management services and (2) construct the Project on a guaranteed maximum price basis.

Scope

Construction Manager shall cause or otherwise guaranty to be performed and provided through Subcontractors, or its own forces with respect to general conditions and general requirements work, all labor, material, equipment, tools and services required for the complete construction of the Project in accordance with the terms of the Contract Documents and laws, statutes and regulations applicable to the work to be performed by Construction Manager.

Pre-construction Services

As part of the pre-construction Work, the costs of which shall not be included within the GMP, Construction Manager shall:

  • meet and consult with Owner, Architect, the engineers and consultants with respect to the Work and development of the Drawings and Specifications for the Project, including, without limitation, geotechnical considerations and related site work, all building systems (e.g. MEP, structural, utilities, IT), Design-Assist Work and all governmental or other permits and approvals required in connection with the Project;
  • make recommendations to Owner with respect to the availability and cost of materials [...], equipment and labor; the selection of materials; the selection of building systems and equipment, costs of construction [...], construction feasibility and alternative methods of construction, necessary temporary and support facilities;
  • provide and at appropriate intervals as reasonably required by Owner refine Project budget estimates for the Work, including monthly cost projections or forecasts once the major requirements of the Project have been identified;
  • review the Contract Documents as they are being prepared by Architect and make recommendations to Owner and Architect with respect to constructability, material availability and cost, and value engineering;
  • develop and pursue programs to encourage interest in the Project with Subcontractors and material suppliers with a particular focus on minority, veteran and women owned businesses.

Construction Manager shall expedite and secure competitive bids from at least three (3) Construction Manager pre-qualified and Owner approved bidders, whenever possible [...] for each portion of the Work to be performed by a Subcontractor or self-performed by Contractor.

Additional information

Construction Manager is required to use Owner's project management software.

Owner utilizes an electronic contract compliance system known as the B2GNow Compliance Reporting System. This Contract is subject to compliance tracking.

Construction Manager shall be Paid for Preconstruction Services in accordance with the Fee Sheet attached as Exhibit C.

Construction Manager represents that it has visited the site, become familiar with local conditions, including the labor market, under which the Work is to be performed and correlated personal observations with the requirements of the Contract Documents.

Documents

11 files

Sign up free to get these 11 documents.

  • 2027-0001 Carver HS New School of Arts Modification and Renovations-SOW - Final.pdf
    Download
  • Administrative Forms - Attachment 1-10.pdf
    Download
  • APS Background Check Consent Form 3.4.2022.pdf
    Download
  • Atlanta Public School System Construction Management at Risk Agreement.pdf
    Download
  • Attachment A -Offeror Reference Form.pdf
    Download
  • Attachment B Current Work Load Form.pdf
    Download
  • Attachment C 2027-0001Carver High School New School of Arts Modification Fee Sheet.pdf
    Download
  • Carver HS - Inventory Drawings and Floor Plans (2).pdf
    Download
  • FEE and GENERAL CONDITIONS ASSUMPTIONS.pdf
    Download
  • GENERAL TERMS AND CONDITIONS 10-2022.pdf
    Download
  • Quantum Vendor Registration Guide.pdf
    Download

Similar open bids

In Georgia

More from Atlanta Public Schools

Open bids