Lincoln County Board of Commissioners (Georgia) posted this RFP on Oct 26, 2026. Responses are due Dec 30, 2026. Category: Information Technology. Questions are due 2026-11-25 14:00. Solicitation number PE-69000-NONST-2027-000000016.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Lincoln County, Georgia (the "County") is soliciting sealed proposals from qualified vendors to furnish, install, configure, test, train, and support a modern, Next Generation 911 (NG911)-capable Computer-Aided Dispatch (CAD) system for the Lincoln County E911 Communications Center (the "Center").
The successful Offeror shall provide a complete turnkey solution, including all required hardware, software, licensing, implementation services, training, documentation, testing, warranty, and ongoing maintenance.
The selected vendor ("Offeror") shall provide a complete, turnkey CAD solution, including all hardware, software, licensing, interfaces, installation, configuration, data conversion (if applicable), testing, training, documentation, and warranty/maintenance support necessary for a fully operational system supporting three (3) dispatch positions and a management position, as described in this RFP. The Scope of Work includes, at minimum:
Submission
Proposals must be received no later than **December 30, 2026, at 2:00 PM (ET)**. Late proposals will not be considered. Offerors shall submit five (5) hard copies and one (1) electronic copy (USB drive which won't be returned) of their proposal. Pricing is to be provided on the form in *Attachment A*.
Evaluation
Proposals will be evaluated by a County evaluation committee based on the following criteria:
| Criterion | Weight |
| --- | --- |
| Compliance with technical requirements (Section 5) | 30% |
| Vendor qualifications, references, and installation history (Section 6) | 20% |
| Implementation plan and proposed schedule | 15% |
| Training and ongoing support/maintenance approach | 10% |
| Total cost of ownership (Section 8) | 25% |
The County reserves the right to request oral presentations, demonstrations, or site visits from one or more Offerors as part of the evaluation process, and to reject any or all proposals in the County's best interest.
Insurance
*Federal Work Authorization Program Affidavit* required for the Offeror and a separate form will be required for all subcontractors.
Sign up free to get this document.