Dunwoody Road Gap Fill Sidewalk T6026-2

Active PE-66098-NONST-2027-000000152 ITBConstruction - Heavy & CivilCity of Sandy Springs
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Sandy Springs (Georgia) posted this ITB on Oct 13, 2026. Responses are due Nov 13, 2026. Category: Construction - Heavy & Civil. Solicitation number PE-66098-NONST-2027-000000152.

Solicitation details

General information

Solicitation number
PE-66098-NONST-2027-000000152
Notice type
ITB
Place of performance
Georgia

Agency and category

Agency
City of Sandy Springs
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Sandy Springs is seeking bids from qualified contractors for the Dunwoody Road Gap Fill Sidewalk Project (T6026-2).

The project includes constructing approximately 340 linear feet of six-foot-wide sidewalk with a two-foot landscape strip near Dunwoody Road and Spalding Drive.

Scope

Project Location

1165 SPALDING DR & 1185 DUNWOODY RD NE, *Plan and Profile of Proposed Sidewalk Gap Fill Improvements*, Project No. T6026-2.

Additional work includes grading, curb and gutter installation, pavement markings, signage, utility adjustments, erosion control, and traffic management.

  • ALL WORK TO BE DONE IN ACCORDANCE WITH CITY OF SANDY SPRINGS TECHNICAL MANUAL AND CODE, CURRENT EDITION, AS WELL AS GDOT STANDARDS AS A BACKUP SOURCE.
  • ALL CONCRETE SIDEWALKS AND WHEELCHAIR RAMPS LOCATED IN THE RADIUS RETURN SHALL BE 8" THICKNESS.
  • THE CONTRACTOR SHALL OBTAIN TINTED CONCRETE FROM AND APPROVED CONCRETE PLANT. THE CONCRETE SHALL BE TINTED TO CLOSELY MATCH THE ADJACENT ASPHALT PAVEMENT COLOR.
  • ALL DRIVEWAYS THAT ARE TO BE RECONSTRUCTED SHALL BE REPLACED, IN KIND, I.E., ASPHALT FOR ASPHALT, CONCRETE FOR CONCRETE.
  • THE CONTRACTOR SHALL MAINTAIN INGRESS AND EGRESS TO DRIVEWAYS AT ALL TIMES.
  • TRIM ALL TREE LIMBS TO PROVIDE A MINIMUM OF 10' CLEARANCE ABOVE THE SIDEWALK.
  • ALL SILT FENCES MUST BE PLACED AS ACCESS IS OBTAINED DURING CLEARING. NO GRADING SHALL BE DONE UNTIL SILT FENCE INSTALLATION IS COMPLETE.
  • A NOTICE OF INTENT (NOI) IS NOT REQUIRED FOR THIS PROJECT.

Additional information

A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.

THE CONTRACTOR SHALL BID ON GRASSING COMPLETE, LUMP SUM.

PRICE BID FOR TRAFFIC CONTROL-LUMP SUM SHALL INCLUDE, BUT IS NOT LIMITED TO, CONSTRUCTION, MAINTENANCE, AND REMOVAL OF TEMPORARY SIGNING AND PAVEMENT MARKINGS, BARRICADES, CHANNELIZING DEVICES, ETC. REQUIRED FOR MAINTENANCE OF TRAFFIC DURING CONSTRUCTION.

Documents

4 files

Sign up free to get these 4 documents.

  • Vendor Responsibility Questionnaire (VRQ).docx
    Download
  • ITB 27_013 Dunwoody Road Gap Sidewalk T6026_2.pdf
    Download
  • Special Provisions.pdf
    Download
  • ITB 27_013 Dunwoody Road Gap Fill Plans.pdf
    Download