City of Canton (Georgia) posted this RFP on Nov 3, 2026. Responses are due Dec 11, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-25 16:00. Solicitation number PE-66114-NONST-2027-000000038.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Canton ("City") is requesting proposals for qualified construction contractors to submit proposals to provide on-call emergency and repair services for the City's water distribution, sanitary sewer, and stormwater drainage systems.
The City intends to establish an On-Call Emergency Task Order Contract and select a pre-qualified short list of two (2) to three (3) contractors for up to a five (5) year term. Issuance of this RFP does not guarantee any specific volume or frequency of work.
Operational Requirements & Response Times
Representative Scope Examples
**Regulatory & Safety Compliance** – All contractors and performed work must strictly adhere to:
Submission
Proposals must be limited to a maximum of 20 pages (excluding covers, dividers, and Appendix A). Submit one (1) original hard copy and one (1) electronic copy (PDF on a flash drive) in a sealed envelope clearly labeled with the Project Name and Proposer's Name/Address to the address listed above. Submittals received after **December 11, 2026, at 10:00 AM** will be rejected without review. Emailed or faxed proposals will not be accepted.
Submittals must include the following organized sections:
1. Company Qualifications: Company name, history, primary contact details, technical expertise, and applicable Georgia utility/contractor licenses.
2. Personnel & Staffing: Average crew sizes, primary personnel locations, key staff profiles, and organizational capability.
3. Insurance Documentation: Proof of coverage for General Liability, Professional Liability (if applicable), Workers' Compensation, and Commercial Auto.
4. Proposed Work Plan: Detailed strategy for executing routine and emergency work, emergency mobilization protocols, response times, and timeline for delivering routine estimates.
5. Equipment & Coordination: Comprehensive list of available machinery/vehicles. Commitment to coordinate directly with City Employees.
6. Fee Proposal (Appendix A): Complete unit rate sheet. Labor and equipment rates must remain firm for two (2) years, with annual adjustments permitted thereafter. Contractor-supplied materials are subject to a maximum 10% markup (invoices required).
7. Completed *Contractor Information Form* (Appendix C), *Conflict of Interest Certification* (Appendix D), *E-Verify Federal Work Authorization* (Appendix E), and *Vendor Statement of Tax Status* (Appendix F).
Minimum Liability Requirements
Evaluation
Proposals will be evaluated qualitatively based on the following key areas:
Sign up free to get this document.