City of Monroe (Georgia) posted this IFB on Oct 21, 2026. Responses are due Nov 19, 2026. Category: Construction - Heavy & Civil. Solicitation number PE-74750-NONST-2026-000000030.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
City of Monroe (Owner) is requesting Bids for the construction of the following Project:
SR 11 at US 78 East Bound Ramp Intersection Improvements
KW Project No. 240294
The project consists of widening the SR 11 at US 78 eastbound ramp in Monroe, Georgia, as well as the installation of a new traffic signal at the intersection of SR 11 and US 78 eastbound ramps. The work includes demolition of existing raised medians, roadway widening, milling and resurfacing asphalt, traffic signal installation, striping and road markings, erosion control.
Bids for the construction of the Project will be received at the Monroe City Hall located at 215 N Broad Street, until **Thursday, November 19th, at 2:00 pm local time**. At that time the Bids received will be publicly opened and read.
Bid security shall be submitted with each bid in the amount of **5 percent** of the total bid amount. No bid may be withdrawn for a period of 60 calendar days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities.
No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds either a Georgia State Contractor's License, Georgia State Utility Contractor's License, or qualifications with the Georgia Department of Transportation for similar work, in compliance with Act. O.C.G.A. 43-14 and 43-41. Failure to provide the bidder's license or qualification number on the outside of the sealed proposal will result in rejection of the bid.
If the Contract is to be awarded, Owner will award the Contract on the basis of the base bid alone. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of **365 calendar days**.
Sign up free to get these 2 documents.