Telfair Wheeler Airport Authority (Georgia) posted this RFQu on Nov 5, 2026. Responses are due Dec 7, 2026. Category: Architecture & Engineering. Questions are due 2026-11-30 14:00. Solicitation number PE-33754-NONST-2027-000000003.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Telfair Wheeler Airport Authority is seeking a qualified aviation consulting firm to provide professional on-call planning, engineering, architectural, and construction inspection/administration services, including, but not limited to, geotechnical/subsurface investigations and topographic surveying, environmental assessments, preliminary and final design, and bidding, at the Telfair Wheeler Airport, McRae, Georgia.
Two separate qualification packages are requested:
1. Planning and environmental services.
2. Professional on-call engineering, architectural, and construction inspection/administration services.
Each submittal will be evaluated independently on its own merits. Two separate contracts will be awarded, which may be awarded to different firms.
The scope of work to be included in the Master Agreement may include, but is not limited to, the following:
Projects are limited to those in the attached project list and may be accomplished over multiple years, task orders, and Federal and State grants. Projects or work elements not included in this list or agreement may require additional procurement actions to ensure compliance with Federal and State requirements and to ensure qualification of staffing for specialized tasks.
Submittal
All interested parties should submit six (6) hard copies and an electronic PDF copy of the *Statement of Qualifications*, which shall contain no more than thirty (30) pages, excluding tabs and a cover letter not exceeding two (2) pages. Statements received after stated deadline will not be considered.
The deadline for submittal is **2:00pm local time, December 07, 2026**. The *Statement of Qualifications* should be delivered in a sealed envelope or box clearly marked, “Airport Consulting & Engineering Services.”
Responses are to be addressed to: Telfair Wheeler Airport Authority, Attn: Jimmy Ray, c/o Wheeler BOC, 20 W Forest Ave, Alamo, GA 30411.
Evaluation Criteria
It is the intent of the Telfair Wheeler Airport Authority to enter into a Master Agreement with a consultant for the upcoming five (5) year period. Consultants may request an airport site visit prior to submittal. **Disadvantaged Business Enterprise (DBE) utilization is required for federally funded projects over $250,000.** No overhead rate, fees, or any cost information should be identified as part of this submission.
Sign up free to get this document.