Davis Lodge Roof Replacement & Kitchen Remodel

Active Bid #2027-16 ITBConstruction - BuildingCity of Bloomington
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Bloomington (Illinois) posted this ITB on Oct 27, 2026. Responses are due Nov 24, 2026. Category: Construction - Building. Questions are due 2026-11-12 12:00. Solicitation number Bid #2027-16.

Solicitation details

General information

Solicitation number
Bid #2027-16
Notice type
ITB
Place of performance
Illinois
Questions due
2026-11-12 12:00

Agency and category

Agency
City of Bloomington
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Davis Lodge is a historic lakefront rental facility located on Lake Bloomington and serves as a popular venue for weddings, reunions, and other community events. The project consists of roofing replacement and select interior renovations intended to extend the service life of the facility, improve building performance, and enhance functionality for ongoing public use.

The City of Bloomington, Illinois ("City") is accepting sealed bids for Bid #2027-16, Davis Lodge Roof Replacement & Kitchen Remodel.

Scope

The Work includes replacement of the existing roofing system and, if awarded, renovation of the existing kitchen. Due to the lack of existing record drawings, field verification of existing conditions will be required.

The project is organized as follows:

  • **Base Bid:** Remove and replace the existing asphalt shingle roof system with a new architectural asphalt shingle roofing system.
  • **Alternate No. 1:** Provide a new metal shingle roofing system in lieu of the architectural asphalt shingle roofing system included in the Base Bid.
  • **Alternate No. 2:** Renovate the existing kitchen, including replacement of cabinetry, countertops, and plumbing fixtures; installation of new interior finishes; and associated modifications to building systems necessary to support the renovation.

The Contract Documents are structured to provide flexibility in project award based on available funding through the use of bid alternates.

Please refer to the Specifications (Project Manual) and Drawings attachments for complete project requirements.

Construction activities associated with this project must occur exclusively during the period of **March 7, 2027, through March 27, 2027**, due to this property being utilized as a rental facility.

Additional information

Sealed bids will be received via the City's e-Procurement Portal, OpenGov (https://procurement.opengov.com/portal/cityblm), until **Tuesday, November 24, 2026 at 10:00 am Central time**, at which time they will be publicly opened and read.

A **mandatory** pre-bid meeting/site visit will be held on Thursday, November 5, 2026 at 9:00 am central time, at Davis Lodge, 25449 Davis Lodge Road, Hudson, Illinois 61748. Attending the pre-bid meeting/site visit is a requirement to submit a response to this solicitation.

Bid must be accompanied by a Bid guaranty which shall not be less than **ten percent (10%)** of the amount of the Bid. Bid guaranty may be a cashier's check, money order, certified bank check, or a surety bond. The successful bidder will be required to provide Performance and Payment Bonds in the amount equal to **100%** of the contract price, within ten (10) business days after the bid award.

Contractors shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Prevailing Wage Act (820 ILCS 130/1-12) including Public Act 100-1177 effective June 1, 2019.

Bids may not be withdrawn for a period of 90 days after the bid opening date.

The City may award the Base Bid, any individual Alternate, any combination of Alternates, or no Alternates at all.

Documents

3 files

Sign up free to get these 3 documents.

  • Bid_#_2027-16_Davis_Lodge_Roof_Replacement_&_Kitchen_Remodel_-_Scope_of_Work_Project_Manual.pdf
    Download
  • Bid_#_2027-16_Davis_Lodge_Roof_Replacement_&_Kitchen_Remodel_-_Drawings.pdf
    Download
  • Davis_Lodge_Roof_Replacement_&_Kitchen_Remodel.pdf
    Download

Similar open bids

In Illinois