Howard Community College (Maryland) posted this RFP on Oct 13, 2026. Responses are due Nov 20, 2026. Category: Telecommunications. Solicitation number BPM059292.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Board of Trustees of Howard Community College invites proposals from qualified Tellabs-certified or Tellabs-experienced integrators to replace the College's existing Motorola Passive Optical Network (PON) equipment with Tellabs equipment, including a redundant OLT architecture and IEEE 802.1X network access control integration.
Howard Community College ("College") is requesting proposals from qualified Tellabs-certified or Tellabs-experienced integrators to provide all necessary labor, project management, configuration, integration, testing, documentation, and migration services required to replace the College's existing Motorola Passive Optical Network (PON) equipment with the Tellabs equipment identified in the College-provided Bill of Materials (BOM), including IEEE 802.1X network access control on applicable interfaces.
The College's current environment consists of a Motorola PON network supporting campus voice, data, and multicast services. This project aims to modernize the campus PON environment by replacing active electronics in campus offices and telecommunications spaces while maintaining and reusing the existing outside plant infrastructure wherever feasible.
The College intends to implement a redundant Tellabs Optical Line Terminal (OLT) architecture. To support OLT redundancy and improved resiliency, the College will replace existing 1x32 optical splitters with 2x32 optical splitters. [...] Existing OLT locations will remain unchanged, and the Tellabs OLTs shall be installed in the same telecommunications spaces currently housing the Motorola OLT equipment.
Included in Scope
Not Included in Scope
All sealed proposals MUST BE RECEIVED via Equity Hub's Bid Locker at https://bidlocker.us/details/6573_Motorola_Pon_To_Tellabs_Pon_Migration by **11:00 a.m. local time on November 20th, 2026**.
A **mandatory** pre-proposal conference and site walk will be held on October 21st at 2:00 pm. Failure to attend may result in the proposal being deemed non-responsive.
MBE Subcontracting Goal: Twenty-nine percent not mandatory but strongly encouraged.
Contract Type: Firm Fixed Price.
Contract Duration: From Notice to Proceed through written final acceptance, followed by a minimum one (1) year workmanship warranty.
The Board of Trustees of Howard Community College reserves the right to reject any and all proposals and to waive any formalities, informalities, or technicalities as it deems necessary, appropriate and in the College's best interests. Final award of the contract is subject to the availability of funding for this project.
Sign up free to get this document.