2028 Liberty County Mobility Plan

Active OpenGov-592f57c4 RFPArchitecture & EngineeringHouston-Galveston Area Council
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Houston-Galveston Area Council (Texas) posted this RFP on Oct 21, 2026. Responses are due Dec 3, 2026. Category: Architecture & Engineering. Questions are due 2026-11-04. Solicitation number OpenGov-592f57c4.

Solicitation details

General information

Solicitation number
OpenGov-592f57c4
Notice type
RFP
Place of performance
Texas
Questions due
2026-11-04

Agency and category

Agency
Houston-Galveston Area Council
Category
007Architecture & Engineering
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Houston-Galveston Area Council (H-GAC) has partnered with Liberty County, Texas, to develop a comprehensive countywide Mobility Plan update. Located approximately 50 miles northeast of downtown Houston, Liberty County is experiencing rapid growth due to its proximity to the expanding metropolitan area, with its population increasing from about 91,600 in 2020 to over 120,000 in 2025 and projected to continue rising through 2035 based on regional growth forecasts from the Houston-Galveston Area Council and population projections from the Texas Demographic Center.

H-GAC and Liberty County completed the Liberty County Mobility Study in 2022. Since then, the County continues to experience significant growth and has requested an update to the study to address current and anticipated transportation needs due to rapid development occurring. The Liberty County Mobility Plan will be an update to the 2022 Mobility Study, resulting in a county-wide mobility plan.

Scope

Task 1: Project Management and Coordination

Prepare a Project Management Plan (PMP) describing the overall approach and methodology to completing the Study. [...] Progress reports, and updated project schedules must be submitted to H-GAC's Project Manager monthly. Monthly progress reports are required regardless of whether the Contractor submits an invoice for that month.

Task 2: Public Outreach and Engagement

Develop an extensive outreach plan to foster meaningful participation of the community and facilitate equitable participation within the County. The Contractor will incorporate these concepts into the Public Involvement Plan (PIP). The PIP must be completed within the first 45 days of the contract. [...] In previous studies, H-GAC required a minimum of three (3) Steering Committee meetings, two (2) "rounds" of Focus Group meetings and two (2) public events for each precinct.

Task 3: Identification of Issues, Needs, and Gaps

Collect all data necessary to evaluate existing and future conditions. Using the collected data, the contractor will identify the mobility needs issues and gaps in Liberty County roadway network.

Task 4: Analysis of Identified Issues

Identify transportation needs, deficiencies, opportunities, and priorities throughout the study area. [...] A minimum of three (3) conceptual cross-sections or equivalent visual renderings must be prepared under this task.

Task 5: Recommendations

Identify short- (0-5 years), intermediate- (6-10 years) and long-range (11+ years) mobility recommendations to address the needs/issues identified in Task 3.

Final Contract Deliverables

  • A completed public participation plan
  • Online Interactive project map
  • Final Plan Document that includes an executive summary and a summary report of overarching issues, needs, gaps and solutions in Liberty County.
  • Stand-alone Executive Summary
  • Implementation Workbooks for Liberty County
  • H-GAC Project Tracker populated.
  • Electronic copies of all deliverables, including but not limited to, shapefiles, map packages, images, photographs, graphics, data, text files, and Microsoft Word documents used during the study and in the report, etc.

Additional information

**Submission method:** Responses must be submitted electronically via the OpenGov system at https://procurement.opengov.com/portal/h-gac before the deadline of **December 3, 2026, 12:00 pm**. Submissions must be in PDF or Excel format ONLY where indicated and uploaded to the designated section. Zip files are not allowed. Late or incomplete submissions will not be accepted.

Respondents must submit questions by the Questions deadline, **November 4, 2026**. Telephone/email inquiries are not accepted.

**Budget:** Funds will not exceed **$600,000** total ($600,000* federal).

Note: This is a planning study; no engineering services or stamped drawings are required.

Documents

2 files

Sign up free to get these 2 documents.

  • GP_Core_Template_for_Solicitation_Certification_11.2.23.pdf
    Download
  • 2028_Liberty_County_Mobility_Plan.pdf
    Download