Newman Substation Rebuild Control Enclosure

Active REQ00003478 RFPUtilities & EnergyCity of Garland
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Garland (Texas) posted this RFP on Nov 23, 2026. Responses are due Dec 10, 2026. Category: Utilities & Energy. Questions are due 2026-12-07 17:00. Solicitation number REQ00003478.

Solicitation details

General information

Solicitation number
REQ00003478
Notice type
RFP
Place of performance
Texas
Questions due
2026-12-07 17:00

Agency and category

Agency
City of Garland
Category
018Utilities & Energy
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

Scope

Control enclosure vendor is responsible for final material counts and part numbers.

Control enclosure vendor is responsible for sizing and providing the (2) HVAC units.

Vendor to install Vigilant battery monitoring system and associated sensor following the proper procedures provided by Eagle Eye.

Additional information

NO FAXED OR EMAILED BIDS! All documents (forms) herein and attached are required to be completed and returned with response.

A Bid Bond in the amount of 5% will be required with your bid response. Failure to provide it will deem your bid incomplete and therefore non-responsive.

A Performance, Payment and 5 year Maintenance Bond (or Warranty) will be required upon notification of award.

Required Delivery Date: October 2028

Documents

64 files

Subscribe to get these 64 documents.

  • Bid Invitation.pdf
    Download
  • NES-2110-01 - REV 0 CONTROL ENCLOSURE EQUIPMENT LAYOUT - SHT 1 OF 1-LAYOUT.pdf
    Download
  • NES-2212-01 - REV 0 PANEL NO. 7 138KV MILLER LINE LAYOUT - SHT 1 OF 12-LAYOUT.pdf
    Download
  • NES-2205-02 - REV 0 CONTROL ENCLOSURE RELAY PANEL LINEUP - SHT 2 OF 3-LAYOUT.pdf
    Download
  • NES-2205-03 - REV 0 CONTROL ENCLOSURE RELAY PANEL LINEUP - SHT 3 OF 3-LAYOUT.pdf
    Download
  • NES-2120-01 - REV 0 CONTROL ENCLOSURE BOM - SHT 1 OF 1-LAYOUT.pdf
    Download
  • NES-2117-01 - REV 0 CONTROL ENCLOSURE STAIR AND LANDING DETAIL - SHT 1 OF 1-LAYOUT.pdf
    Download
  • NES-2221-02 - REV 0 FIBER RACK BOM - SHT 2 OF 2-LAYOUT.pdf
    Download
  • NES-2210-02 - REV 0 PANEL NO. 5 138KV TIE GCB 3235 BOM - SHT 2 OF 10-LAYOUT.pdf
    Download
  • GPL Control Enclosure bid evaluation.xlsx
    Download
  • Performance Bond Example.pdf
    Download
  • NES-2013-01 - REV 0 DC DISCONNECT SWITCH CONNECTION DIAGRAM - SHT 1 OF 1-LAYOUT.pdf
    Download
  • NES-2209-01 - REV 0 PANEL NO. 4 138KV NAAMAN LINE LAYOUT - SHT 1 of 12-LAYOUT.pdf
    Download
  • NES-2221-01 - REV 0 FIBER RACK LAYOUT - SHT 1 OF 2-LAYOUT.pdf
    Download
  • NES-2218-02 - REV 0 PANEL NO. 13 COMMUNICATION BOM - SHT 2 OF 15-LAYOUT.pdf
    Download
  • NES-2201-01 - REV 0 RELAY PANEL BOM - SHT 1 OF 2-LAYOUT.pdf
    Download
  • NES-2206-02 - REV 0 PANEL NO. 1 138KV WALNUT LINE BOM - SHT 2 of 12-LAYOUT.pdf
    Download
  • NES-2219-02 - REV 0 PANEL NO. 14 COMMUNICATION BOM - SHT 2 OF 15-LAYOUT.pdf
    Download
  • NES-2205-01 - REV 0 CONTROL ENCLOSURE RELAY PANEL LINEUP - SHT 1 OF 3-LAYOUT.pdf
    Download
  • NES-2601-01 - REV 0 TERMINATION CABINET NO. 2 ELEVATIONS - SHT 1 OF 2-LAYOUT.pdf
    Download
  • NES-2204-02 - REV 0 TYPICAL COMMUNICATION PANEL STRUCTURE - SHT 2 OF 2-LAYOUT.pdf
    Download
  • NES-2211-01 - REV 0 PANEL NO. 6 138KV FUTURE LINE LAYOUT - SHT 1 OF 12-LAYOUT.pdf
    Download
  • NES-2216-01 - REV 0 PANEL NO. 11 138KV BUS NO. 2 LAYOUT - SHT 1 OF 9-LAYOUT.pdf
    Download
  • NES-2217-02 - REV 0 PANEL NO. 12 138KV CAP BANK BOM - SHT 2 OF X-LAYOUT.pdf
    Download
  • NES-2008-01 - REV 0 DC PANELS - SHT 1 OF 1-LAYOUT.pdf
    Download
  • NES-2600-01 - REV 0 TERMINATION CABINET NO. 1 ELEVATIONS - SHT 1 OF 2-LAYOUT.pdf
    Download
  • NES-2209-02 - REV 0 PANEL NO. 4 138KV NAAMAN LINE BOM - SHT 2 of 12-LAYOUT.pdf
    Download
  • 2 Year Maintenance Bond Example.pdf
    Download
  • NES-2214-02 - REV 0 PANEL NO. 9 138KV FUTURE LINE BOM - SHT 2 OF 12-LAYOUT.pdf
    Download
  • NES-2214-01 - REV 0 PANEL NO. 9 138KV FUTURE LINE LAYOUT - SHT 1 OF 12-LAYOUT.pdf
    Download
  • CONTROL ENCLOSURE SECURITY Standard L - Rev4_ 02242025.docx
    Download
  • NES-2204-01 - REV 0 TYPICAL RELAY PANEL STRUCTURE - SHT 1 OF 2-LAYOUT.pdf
    Download
  • NES-2217-01 - REV 0 PANEL NO. 12 138KV CAP BANK LAYOUT - SHT 1 OF X-LAYOUT.pdf
    Download
  • NES-2211-02 - REV 0 PANEL NO. 6 138KV FUTURE LINE BOM - SHT 2 OF 12-LAYOUT.pdf
    Download
  • NES-2012-01 - REV 0 BATTERY CHARGER CONNECTION DIAGRAM - SHT 1 OF 1-LAYOUT.pdf
    Download
  • 2026.10.16 - Newman Control Enclosure IFB Package.pdf
    Download
  • NES-2212-02 - REV 0 PANEL NO. 7 138KV MILLER LINE BOM - SHT 2 OF 12-LAYOUT.pdf
    Download
  • NES-2210-01 - REV 0 PANEL NO. 5 138KV TIE GCB 3235 LAYOUT - SHT 1 OF 10-LAYOUT.pdf
    Download
  • NES-2207-02 - REV 0 PANEL NO. 2 138KV TIE GCB 3215 BOM - SHT 2 of 10-LAYOUT.pdf
    Download
  • NES-2213-01 - REV 0 PANEL NO. 8 138KV TIE GCB 3255 LAYOUT - SHT 1 OF 10-LAYOUT.pdf
    Download
  • NES-2218-01 - REV 0 PANEL NO. 13 COMMUNICATION LAYOUT - SHT 1 OF 15-LAYOUT.pdf
    Download
  • Payment Bond Example.pdf
    Download
  • Fiber specs_revised 2025-11-1.docx
    Download
  • NES-2220-01 - REV 0 WANDMZ RACK LAYOUT - SHT 1 OF 12-LAYOUT.pdf
    Download
  • NES-2219-01 - REV 0 PANEL NO. 14 COMMUNICATION LAYOUT - SHT 1 OF 15-LAYOUT.pdf
    Download
  • NES-2207-01 - REV 0 PANEL NO. 2 138KV TIE GCB 3215 LAYOUT - SHT 1 OF 10-LAYOUT.pdf
    Download
  • City of Garland Terms Conditions V1058 - OCA rev - Goods.pdf
    Download
  • Garland Power and Light Safety Compliance Addendum.pdf
    Download
  • NES-2208-02 - REV 0 PANEL NO. 3 138KV XFMR NO. 2 LINE BOM - SHT 2 OF 12-LAYOUT.pdf
    Download
  • NES-2206-01 - REV 0 PANEL NO. 1 138KV WALNUT LINE LAYOUT - SHT 1 OF 12-LAYOUT.pdf
    Download
  • NES-2213-01 - REV 0 PANEL NO. 8 138KV TIE GCB 3255 LAYOUT - SHT 1 OF 10-LAYOUT.zip
    Download
  • networkDesign_Substations_v7_20250815.pdf
    Download
  • Control Enclosure Specification - Main Specification - December 2025.pdf
    Download
  • NES-2213-02 - REV 0 PANEL NO. 8 138KV TIE GCB 3255 BOM - SHT 2 OF 10-LAYOUT.pdf
    Download
  • NES-2112-01 - REV 0 CONTROL ENCLOSURE CABLE TRAY LAYOUT - SHT 1 OF 1-LAYOUT.pdf
    Download
  • Notice to Bidders Document.docx
    Download
  • NES-2215-02 - REV 0 PANEL NO. 10 138KV BUS NO. 1 BOM - SHT 2 OF 9-LAYOUT.pdf
    Download
  • NES-2114-01 - REV 0 CONTROL ENCLOSURE LIGHTING PLAN LAYOUT - SHT 1 OF 1-LAYOUT.pdf
    Download
  • NES-2220-02 - REV 0 WANDMZ RACK BOM - SHT 2 OF 12-LAYOUT.pdf
    Download
  • NES-2216-02 - REV 0 PANEL NO. 11 138KV BUS NO. 2 BOM - SHT 2 OF 9-LAYOUT.pdf
    Download
  • NES-2208-01 - REV 0 PANEL NO. 3 138KV XFMR NO. 2 LINE LAYOUT - SHT 1 of 12-LAYOUT.pdf
    Download
  • NES-2215-01 - REV 0 PANEL NO. 10 138KV BUS NO. 1 LAYOUT - SHT 1 OF 9-LAYOUT.pdf
    Download
  • NES-2201-02 - REV 0 RELAY PANEL BOM - SHT 2 OF 2-LAYOUT.pdf
    Download
  • NES-2006-01 - REV 0 AC PANEL - SHT 1 OF 5-LAYOUT.pdf
    Download

Similar open bids

In Texas

More from City of Garland

Open bids