City of Cedar Rapids (Texas) posted this IFB on Oct 30, 2026. Responses are due Nov 16, 2026. Category: Parks & Recreation. Questions are due 2026-11-09 15:00. Solicitation number PUR1026-132.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Notice is hereby given that sealed bids will be received electronically before 3:00pm on Monday, November 16, 2026, for Shade Shelter for Redmond Park as requested by the City of Cedar Rapids Parks & Recreation Department.
Firm fixed price for the purchase and delivery of Shade Shelter materials - City staff will construct a four-sided ribbed steel roof & tubular steel frame shelter, 20'x24'.
Firm fixed price for the purchase and delivery of Shade Shelter materials - City staff will construct a four-sided ribbed steel roof & tubular steel frame shelter, 20'x24'.
Delivery Address
Harbor Maintenance Shop, Ellis Harbor, 2550 Ellis Boulevard NW, Cedar Rapids, IA 52405
The City will only accept bids submitted through the City’s Online E-Procurement portal system (Euna Procurement, powered by IonWave). Email, fax or hard copy Submittals are not acceptable.
Bids will be opened on Monday, November 16, 2026 at 3P:00pm CST (our clock). [...] Bids may be withdrawn any time prior to the scheduled closing time for receipt of bids; no bid may be modified or withdrawn for a period of sixty (60) calendar days thereafter.
Award shall be made to the responsible Bidder submitting the lowest responsive bid with regard to the specifications set forth herein.
Vendor, at its own expense, shall procure and maintain workers compensation, general liability and automobile liability insurance so as to cover risks which shall arise directly or indirectly from Vendor’s obligations and activities.
**Required** attachment: *Descriptive Literature*. Please attach descriptive literature and warranty information. Must include a complete list of materials and drawings.
Sign up free to get these 3 documents.