DFCM Construction - Invitational - Bridgerland Technical College - B&I HVAC Improvement Rooms I-70 and I-189 - Project #27053210

Active CS27027 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Oct 28, 2026. Responses are due Nov 19, 2026. Category: Construction - Building. Questions are due 2026-11-12 15:00. Solicitation number CS27027.

Solicitation details

General information

Solicitation number
CS27027
Notice type
ITB
Place of performance
Utah
Questions due
2026-11-12 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids for Construction services for the project below. Only the Contractors listed below are invited to bid on this project. Bids submitted by Contractors not listed below will not be considered for award.

  • Combustion and Control Service - Gilbert Martinez
  • Commercial Mechanical System and Services - Andrew Mollerup
  • Salmon Mechanical - Zac Schwitzer
  • Todd R Packer Heating and Air Conditioning - Ryan Packer
  • Zion Engineering - Trent Sorenson

Brief Project Description: Installation of an RTU at the B&I Building.

Construction Budget:** **$82,000.00

Scope

Detailed Project Description/Base Bid:

This project shall include: The improvement of the existing HVAC system in rooms I-170 and I-180 through the addition of a new packaged RTU. This shall also include modifications to the existing ductwork, structure, electrical, and controls.

Additive Alternates:

N/A

Project Requirements:

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

Scope:

PROVIDE NEW ROOF MOUNTED MECHANICAL EQUIPMENT WITH NEW GAS PIPING CONNECTIONS, ROOF CURB, ELECTRICAL CONNTECTIONS, DUCTWORK, AND CONTROLS TO SERVE THE EXISTING CLASSROOM. PROVIDE STRUCTURAL RE-ENFORCEMENTS TO SUPPORT THE NEW ROOF MOUNTED EQUIPMENT.

Additional information

**Substantial Completion Date:** May 30, 2027. **Liquidated Damages:** $100.00 per day. Tax Exempt: Yes.

Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. Contractors attempting to submit a bid through U3P website after the bid deadline has passed will not be successful and therefore disqualified from consideration of award of this project.

The Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form, or equivalent, in the amount of **5%** of the bid, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule. If the *DFCM Subcontractors List Form* is not provided by the time and date specified on the Solicitation Schedule, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation.

DFCM intends to enter into a Short Form Construction Contract with the Contractor submitting the lowest responsive and responsible bid.

Documents

4 files

Sign up free to get these 4 documents.

  • 1-CS27027-27053210-Solicitation.pdf
    Download
  • 2-CS27027-27053210-Approved Plans.pdf
    Download
  • 3-CS27027-27053210-Approved Specs.pdf
    Download
  • 4-CS27027-27053210-Hazmat Survey.pdf
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids