DFCM Construction - Prequalified Mechanical Stage II - Administrative Office of the Courts - Layton Court AHU Replacement - Project #27339150

Active CS27025 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Oct 22, 2026. Responses are due Nov 17, 2026. Category: Construction - Building. Questions are due 2026-11-06 15:00. Solicitation number CS27025.

Solicitation details

General information

Solicitation number
CS27025
Notice type
ITB
Place of performance
Utah
Questions due
2026-11-06 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Mechanical Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.

Layton Court AHU Replacement, Administrative Office of the Courts, 425 Wasatch Dr. Layton, UT 84041.

Brief Project Description: Replace AHU, and Split AC unit.

Construction Budget:** **$425,000.00

Scope

Scope of Work

  • Replace one RTU (integrated into BAS) and one cooling-only split system. Provide a DFCM-standard equipment curb and connect a new roof hydrant to domestic water piping.
  • All roof modifications must be performed by a Carlisle and DFCM-certified contractor to maintain the current roof warranty.
  • Work after hours/weekends to minimize occupant disruption. Contractor must maintain building temperature setpoints during business hours.
  • All personnel must submit a BCI background check before arriving on site.

**Additive Alternates:** N/A

Project Requirements

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

Additional information

Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. Contractors attempting to submit a bid through U3P website after the bid deadline has passed will not be successful and therefore disqualified from consideration of award of this project.

The Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P.

All Contractors are required to submit their DFCM Subcontractors List Form to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule.

**Substantial Completion Date:** March 22, 2027

**Liquidated Damages:** $1,000.00 per day

A mandatory meeting will be held on the date and time and at the location specified on the Solicitation Schedule.

Documents

7 files

Sign up free to get these 7 documents.

  • 1-CS27025-27339150-Solicitation.pdf
    Download
  • 2-CS27025-27339150-Approved Plans.pdf
    Download
  • 3-CS27025-27339150-Approved Specs.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids