City of West Sacramento (California) posted this RFP on Oct 16, 2026. Responses are due Nov 20, 2026. Category: Architecture & Engineering. Questions are due 2026-11-06. Solicitation number 26-087-RFP.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide to provide engineering design services for the installation of magnetic door holders at the Recreation Center, 2801 Jefferson Blvd. More details on the City's needs for this work are provided in the Scope of Work.
Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor."
The City intends to install magnetic door holders on fire-rated doors at eight locations within Building K, tied into the existing campus fire alarm system. Proposed device locations have been marked on the existing fire alarm plans by the District's fire alarm contractor and are attached to this RFP.
The Consultant shall serve as the design professional in general responsible charge (DPGRC) and deliver a complete, permit-ready set of construction documents and support the project through construction. DSA has advised that a licensed electrical engineer may serve as the DPGRC given the scope of this project.
Task 1 — Project Initiation and Field Verification
Task 2 — Code Analysis and Permitting
Task 3 — Construction Documents
Prepare a complete set of construction documents, coordinated with the attached fire alarm documents and sufficient for bidding and installing the work without further design by others. Conduit routing shall be designed and shown by the Consultant, not deferred to the contractor as means and methods.
Task 4 — Exemption Documentation
Task 5 — Bid Phase Support (as directed)
Task 6 — Construction Phase Services
Deliverables
**RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:** https://procurement.opengov.com/portal/cityofwestsacramento
RELEASE DATE: October 16, 2026
DEADLINE FOR QUESTIONS: November 6, 2026
RESPONSE DEADLINE: November 20, 2026, 2:00 pm
The Consultant shall not submit construction documents to DSA for plan review without written authorization from the City. Voluntary submittal of an exempt project triggers full DSA plan review and construction oversight.
Agency fees, if any, are paid by the City. The DSA-certified project inspector is retained by the City under separate contract.
Sign up free to get these 9 documents.