City of Long Beach (California) posted this IFB on Oct 14, 2026. Responses are due Nov 20, 2026. Category: Construction - Building. Solicitation number PW-26-800.
The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment. Work will include installation of electrical equipment, new switchgear, conduit, wiring, and all hardscape and site improvements necessary to facilitate component installation. Bids are required for the entire Work.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment. Work will include installation of electrical equipment, new switchgear, conduit, wiring, and all hardscape and site improvements necessary to facilitate component installation. Bids are required for the entire Work.
The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment. Work will include installation of electrical equipment, new switchgear, conduit, wiring, and all hardscape and site improvements necessary to facilitate component installation. Bids are required for the entire Work.
Submission method
Bids will be accepted on behalf of the City, Owner of the work, until **11:00 a.m. Friday, November 20th, 2026**, via the City's online portal https://longbeachbuys.buyspeed.com/ keyword Project R-7282.
Bid security
Bidders must scan and upload with their bid documents, a certified check or bank draft payable to the City of Long Beach, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than **10 percent of the bid**. The original of the above instrument shall be submitted to the City Clerk in a sealed envelope and must be received and time/date stamped by the City Clerk's Office no later than the time and date stated for receipt of bids.
Bonds
The Bidder, if awarded the Contract, will execute and deliver to the City, no later than fifteen (15) calendar days after the date shown on the "Notice of Award," the following items:
Licenses
The Contractor shall possess a valid California Class B Contractor license at the time of bid award. Contractors and subcontractors who will perform work to install Electric Vehicle Charging Equipment (EVSE) must be signatories to the International Brotherhood of Electric Workers (IBEW) and hold a valid C-10 electrical contractors' license.
This work is covered by a Citywide Project Labor Agreement (PLA). This project is subject to the City's SBE Program. Minimum qualifications apply.
Sign up free to get these 3 documents.