2026-26 Annual Stormwater Rehabilitation and Maintenance Construction Services

Active PE-70750-NONST-2027-000000084 RFPConstruction - Heavy & CivilCity of Covington
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Covington (Georgia) posted this RFP on Oct 20, 2026. Responses are due Jan 12, 2027. Category: Construction - Heavy & Civil. Questions are due 2026-12-01 15:00. Solicitation number PE-70750-NONST-2027-000000084.

Solicitation details

General information

Solicitation number
PE-70750-NONST-2027-000000084
Notice type
RFP
Place of performance
Georgia
Questions due
2026-12-01 15:00

Agency and category

Agency
City of Covington
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Covington, Georgia (the "City") requests proposals from qualified contractors to provide on-call stormwater rehabilitation and maintenance construction services on an annual contract. Work will be authorized through individual written Task Orders, except for emergency work authorized under Section 2.1.1. The City does not guarantee any minimum quantity, dollar value, frequency, or type of work under the resulting contract.

Scope

The Contractor shall furnish supervision, labor, materials, equipment, transportation, permits assigned to the Contractor, traffic control, erosion control, testing, cleanup, and incidentals necessary to complete each authorized Task Order. Typical work may include:

  • Open-cut removal and replacement of storm drainage pipe; installation of new storm pipe; and removal of existing pipe without replacement when directed by the City.
  • Removal, replacement, construction, adjustment, or rehabilitation of catch basins, curb inlets, junction boxes, drainage access structures, headwalls with wingwalls, and related appurtenances, including removal of existing drainage structures without replacement.
  • Roadway, curb and gutter, sidewalk, concrete driveway, asphalt driveway, shoulder, and landscaped-area restoration.
  • Ditch and channel grading to establish positive drainage using the minimum excavation reasonably necessary.
  • Riprap, geotextile, sod, seeding, erosion-control measures, and final site stabilization.
  • Excavation, rock excavation, City-authorized imported suitable fill, authorized unsuitable-soil removal, dewatering when specifically authorized, and disposal that is not already included in another complete-pay item.
  • Traffic control, public protection, utility coordination, cleanup, and restoration.
  • Tree removal, small-area clearing and grubbing, and fence or gravel-surface restoration associated with authorized stormwater work.
  • Water and sanitary sewer adjustments, relocations, and associated listed services necessary to resolve conflicts with authorized stormwater work, when expressly included in the Task Order and coordinated with the City's utility representatives.

Storm-drain cleaning, CCTV inspection, cured-in-place pipe, sliplining, geopolymer lining, and other specialized stormwater trenchless rehabilitation are outside the base pricing schedule unless added by addendum or authorized as unlisted work.

Additional information

ALL BIDS MUST BE SUBMITTED IN A SEALED ENVELOPE OR PACKAGE.

Submit one (1) hard copy and one (1) copy on a USB drive. The sealed envelope or package shall be addressed to the attention of Maranna Gilbert and clearly labeled "RFP / Bid No. 2026-26 - On-Call Stormwater Rehabilitation and Maintenance Annual Contract."

Proposals must be received by Tuesday, January 12, 2027 at 10:00 AM. Each proposer is responsible for ensuring timely receipt by the City, regardless of delivery method. A postmark does not establish timely receipt.

The initial term will be one year from the effective date. The City may renew the contract for up to two additional one-year periods by written agreement.

Responsive proposals meeting the required minimum qualifications will be evaluated using the following 100-point matrix.

| Criterion | Points |
| --- | --- |
| Relevant company experience and past performance | 25 |
| Key personnel, available crews, equipment, and capacity | 20 |
| Organization, management, and safety | 10 |
| Project approach and emergency response | 20 |
| Price | 25 |
| Total | 100 |

Performance and payment bonds shall be furnished when required by Georgia law and may be required when expressly stated in a Task Order. The selected Contractor shall maintain the insurance stated in Attachment D throughout the contract and each Task Order.

Documents

1 file

Sign up free to get this document.

Similar open bids

In Georgia

More from City of Covington

Open bids