2026-27 Three Ring Access Road Culvert Improvements

Active PE-70750-NONST-2027-000000086 IFBConstruction - Heavy & CivilCity of Covington
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Covington (Georgia) posted this IFB on Oct 26, 2026. Responses are due Dec 1, 2026. Category: Construction - Heavy & Civil. Solicitation number PE-70750-NONST-2027-000000086.

Solicitation details

General information

Solicitation number
PE-70750-NONST-2027-000000086
Notice type
IFB
Place of performance
Georgia

Agency and category

Agency
City of Covington
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Bids for the construction of the Project will be received at Covington City Hall located at 2194 Emory Street N.W., Covington, GA 30014, until, **Tuesday, December 1, 2026 at 10:00 AM EST** local time.

The Three Ring Access Road Culvert Improvements Project consists of approximately: construction of a 30-foot long 9-foot by 4-foot reinforced concrete box culvert through a perennial stream; streambank stabilization; sanitary sewer main, fiber optic cable, and electrical utility relocations; and erosion and sedimentation control measures on the access road to the Three Ring Pump Station.

Scope

The Three Ring Access Road Culvert Improvements Project consists of approximately: construction of a 30-foot long 9-foot by 4-foot reinforced concrete box culvert through a perennial stream; streambank stabilization; sanitary sewer main, fiber optic cable, and electrical utility relocations; and erosion and sedimentation control measures on the access road to the Three Ring Pump Station.

Remove existing 30" CMP culvert and replace with 9' X 4' RCBC and GDOT 2404 wingwalls.

Access road shall be min 10' width plus 2' shoulders. Provide 8 inches of compacted graded aggregate base conforming to GDOT Section 815.

All work to be completed in the dry. Construct temporary stream bypass, pump-around or approved gravity bypass.

Construct 25 LF of soil encapsulated lifts in right bank from approximately station 0+65 to 0+90.

Construct 25 LF of boulder sill wall in left bank from approximately station 0+65 to 0+90.

Sanitary sewer service shall be maintained during construction. Access to the Three Ring Pump Station shall be maintained at all times.

Additional information

Bids will be received for a single prime Contract. Bids shall be on a Unit Price basis as indicated in the Bid Form. At that time the Bids received will be publicly opened and read. The Owner reserves the right to reject any and all bids.

Bids will be received at Covington City Hall located at 2194 Emory Street N.W., Covington, GA 30014.

Documents

2 files

Sign up free to get these 2 documents.

  • Contract Documents for 3Ring Culvert_signed.pdf
    Download
  • 2026_10_19 Three Ring Culvert Improvements 10.pdf
    Download