City of Atlanta (Georgia) posted this RFP on Oct 22, 2026. Responses are due Nov 27, 2026. Category: Information Technology. Solicitation number PE-66062-NONST-2027-000000506.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The "Inspection Truck Data Storage and Integration Project – OLIO & OIM" will utilize five (5) trucks with two (2) man crews that perform sanitary sewer and stormwater mainline pipe inspections daily throughout the City of Atlanta. These inspections traverse extensive distances and each inspection results in recorded footage used to review, analyze, and store pertinent data. Each video is augmented with metadata specific to inspection location, findings, and other information, then stored in the cloud. Videos will be reviewed by service managers to ensure compliance with regulatory and operational standards.
The above-mentioned contracting opportunity has been designated for competition by and between City of Atlanta Certified Small Business Enterprises (SBEs) only.
The vendor will provide technology for citywide inspection services, beginning with the oldest infrastructure sections in each of the four (4) quadrants throughout the city. The areas that are of emphasis and prioritization will be disseminated to the successful vendor based solely on the OLIO Collection Team’s historical failure research, and they include:
All inspections shall be coded in compliance with the latest NASSCO (National Association of Sewer Service Companies) standards and delivered in formats for future integration that are compatible with the City’s ESRI GIS Map Interface (GIS); Pearpoint Pipeline Inspection System; and its Asset Management Systems (AMS) - WaterWorks (aka CityWorks).
Vendor will provide unlimited cloud-based information storage and unlimited view mode users (Office View), which is included with software license(s). The retention period for said storage will be a minimum of 10 years.
Deliverables
All firms interested in bidding on this project must be certified as a SBE with the City of Atlanta or have an application for SBE certification submitted to OCC no later than the date and time of the bid opening.
Sheltered market program requirements mandate that the successful City of Atlanta awardee self-perform a percentage of the work scope associated with the contract. [...] Services: At least 50 percent of the contract cost for personnel must be performed by the SBE prime contractor's own employees.
The Covenant of Non-Discrimination, the Outreach Efforts Documentation, the SBE Sheltered Market Project Participation Plan, and any other information required by OCC in the solicitation document must be completed in their entirety by each Proponent and submitted with the other required Bid/RFP documents in order for the Bid/RFP to be considered responsive.
There will be no mandatory subcontractor participation goals included in this solicitation.