RFQ# 2026-01 Jackson St. @ SR8 (May St.) - Pedestrian Bridge (PI#0021599)

Active PE-60750-NONST-2027-000000021 RFQuArchitecture & EngineeringCity of Winder
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Winder (Georgia) posted this RFQu on Oct 12, 2026. Responses are due Nov 19, 2026. Category: Architecture & Engineering. Questions are due 2026-11-04 14:00. Solicitation number PE-60750-NONST-2027-000000021.

Solicitation details

General information

Solicitation number
PE-60750-NONST-2027-000000021
Notice type
RFQu
Place of performance
Georgia
Questions due
2026-11-04 14:00

Agency and category

Agency
City of Winder
Category
007Architecture & Engineering
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Winder, Georgia is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide Preconstruction Engineering Design Services for the Jackson Street @ SR 8 (May Street) - Pedestrian Bridge project. This project involves the construction of a 10’ wide pedestrian bridge extending between S. Jackson Street and North Jackson Street and spanning State Route (SR) 8 (May St.).

The City anticipates one (1) Multi-Phase, Project Specific contract to be awarded to one (1) firm, for the project/contract identified.

Scope

Under the terms of the resulting Agreement, the selected consultant will provide preconstruction engineering design services, for the Project identified. The anticipated scope of work for the project/contract is included in Exhibit I. The Consultant shall provide concept development services at the beginning of the project to determine overall project feasibility. The City will determine the subsequent phases of the project based on the concept report provided.

In addition, the City desires that the Consultant has the ability to provide, either with its own forces or through a sub-consultant team member, comprehensive services necessary to fulfill all preliminary engineering services which may arise during the project cycle.

The City may choose to utilize the selected consultant for construction plan revisions, construction administration and construction inspections. These items may be included in the contract scope.

Exhibit I – Project/Contract

  • PI Number: 0021599
  • County: Barrow (City of Winder), Georgia
  • Description: Connecting pedestrian walkways in the downtown area and providing a safer route for pedestrians by constructing a 10’ wide pedestrian bridge extending between South Jackson Street and North Jackson Street and spanning State Route 8 (May St.).

Additional information

**Submission method:** There is one (1) electronic version submittal required. Statements of Qualifications submittals must be a PDF document for each project/contract. To submit your Statement of Qualification, please remit as required above to: P.J. Klein, Assistant City Engineer, Telephone (678) 425-6843, email: patrick.klein@cityofwinder.com. Statements of Qualifications must be received by the City of Winder prior to the deadline indicated in the Schedule of Events. No submittals will be accepted after the time and date set for receipt.

Scoring:

  • Project Manager, Key Team Leader(s) and Prime’s Experience, and Qualifications – 30%
  • Project Manager, Key Team Leader(s) and Prime’s Resources, and Workload Capacity – 20%
  • Technical Approach – 40%
  • Past Performance – 10%

The Selection Committee will identify three (3) to five (5) firms which will be shortlisted.

The City anticipates that the payment method may be Lump Sum, Cost Plus Fixed Fee, Cost per Unit of Work, or Specific Rates of Compensation. As a Project Specific contract, it is the City’s intention that the Agreement will remain in effect until successful completion of the Preliminary Engineering (PE) phase of the projects.

Presented teams must be prequalified in the indicated Area Class(es) in order to be evaluated.

All general communication of relevant information regarding this solicitation will be made via the Georgia Procurement Registry (GPR) under RFQ# 2026-01 Jackson St. @ SR8 (May St.) - Pedestrian Bridge (PI#0021599).

Documents

1 file

Sign up free to get this document.

  • RFQ_ 2026_01 Jackson St_ _ SR8 (May St_) _ Pe.pdf
    Download

Similar open bids

In Georgia