Cobb County School District (Georgia) posted this IFB on Oct 29, 2026. Responses are due Dec 2, 2026. Category: Construction - Building. Questions are due 2026-11-12 14:00. Solicitation number B27030.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This project includes replacement of the existing flat roofs on Buildings 2010, 2011, 2020, 2031, 2040, 2050, and 2051; foundation repairs; flooring replacement throughout; selective window and door replacement; door hardware replacement; and interior and exterior painting.
Sealed bids are requested by the Cobb County School District (CCSD) from General Contractors (current Georgia General Contractor’s License; no other license is acceptable) for the construction of:
This project includes replacement of the existing flat roofs on Buildings 2010, 2011, 2020, 2031, 2040, 2050, and 2051; foundation repairs; flooring replacement throughout; selective window and door replacement; door hardware replacement; and interior and exterior painting.
Submission method
Bids will be received through the CCSD Euna Procurement Portal at https://cobbk12.bonfirehub.com/portal/?tab=openOpportunities. **Due Date/Time: 2:00 PM, ET, December 2, 2026**. Bids submitted in any manner other than through the CCSD Euna Procurement Portal will not be accepted.
**Mandatory** pre-bid conference attendance is a prerequisite to submitting a bid. A representative from your company is required to visit the site to confirm conditions before submitting a bid.
To be eligible to respond to this bid, Contractors must pre-qualify as outlined in CCSD Board Administrative Rule FGC-R. The deadline for submitting pre-qualification requirements for this project is **2:00 PM ET on November 12, 2026**. Contractors must provide proof of previous job experience within 30% of the cost or scope of this project.
Bonds
No bid may be withdrawn for 60 days after bid opening except within 48 hours if an appreciable error can be shown. Bid responses will only be accepted from companies that have downloaded bid documents from the Design Professional.