Roberts Rest Area Maintenance

Active MDT-316686-MS IFBFacilities & JanitorialMontana Department of Transportation
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Montana Department of Transportation (Montana) posted this IFB on Nov 5, 2026. Responses are due Nov 26, 2026. Category: Facilities & Janitorial. Solicitation number MDT-316686-MS.

Solicitation details

General information

Solicitation number
MDT-316686-MS
Notice type
IFB
Place of performance
Montana

Agency and category

Agency
Montana Department of Transportation
Category
014Facilities & Janitorial
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Montana Department of Transportation (Department) is seeking bids from caretaker management firms or individuals for the maintenance of the Roberts Rest Area located in Carbon County on US 212 milepost 84.4.

The work shall include, but not limited to, furnishing labor, equipment, supplies not provided by the Department, tools and materials required to effectively maintain and operate the rest area including the rest rooms, grounds, parking lots and all other facilities within the rest area proper.

The scope of the work does not include the maintenance, repair, or removal of snow from the parking lots including entrances and exits to the parking lots of the rest area.

Scope

The Contractor shall provide appropriate personnel to service and clean the restrooms a minimum of two times a day, seven days per week.

The first service and cleaning for each site shall commence no later than 6:00 am, and the second service and cleaning shall commence no later than 4:00 pm, but no earlier than 3:00 pm.

In addition to routine janitorial services the Contractor will be responsible for, but not limited to, the following typical maintenance duties:

  • Unclog toilet, urinals, and sinks.
  • Touch up paint to maintain appearance.
  • Replace push plates, kick plates and door pulls.
  • Soap and paper dispensers.
  • Mirrors.
  • Electrical lighting bulbs (except high-level parking lot lights).
  • Information signs.
  • Replace heads.
  • Maintain sprinkler-watering zones timing.

The Contractor shall provide all labor, equipment, tools, materials and supplies (except as specified below) necessary to provide minor maintenance services associated with the facilities, landscaping, water supply, and heating systems to effectively maintain and operate the rest areas.

The Contractor shall immediately remove any graffiti or markings of any kind on any surface inside the restrooms.

The Contractor shall be responsible for removing snow and ice from the pedestrian walkways to provide bare walkways for safe access.

The Contractor shall keep a daily checklist and log which will be kept on site and available to the Department at any time.

Copies of the Daily Logs will be mailed or delivered to the Department no less than twice a month.

Additional information

**Submission:** Questions or information relating to either specifications or requirements of this solicitation must be asked through the eMACS Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. Be sure to certify and submit your response once completed.

The bid closes **11/26/2026, 2:00 PM MST**.

The resulting purchase order term is for the period **April 15, 2027 through November 15, 2027**.

The resulting purchase order may, upon mutual agreement, be extended in one (1) year increments for a period not to exceed a total of seven (7) years, [six (6) additional years]. This extension is contingent upon legislative appropriations.

Upon satisfactory completion of services specified herein, the Contractor shall be paid monthly as soon as possible after receipt of invoices.

The Department will perform a minimum of 6 unannounced random evaluations of each rest area facility per month. The scores for the month will be averaged and the resulting average score will be the basis for that months' pay.

Documents

4 files

Sign up free to get these 4 documents.

  • MDT-316686-MS - event notice.pdf
    Download
  • Roberts Rest Area Specifications.docx
    Download
  • CHECKLISTS.docx
    Download
  • Prevailing Wage Rates - Nonconstruction 2026.pdf
    Download

Similar open bids

In Montana

More from Montana Department of Transportation

Open bids