N. Cannon Avenue & Poplar Street Sanitary Sewer Rehabilitation

Active Borough of Lansdale, Montgomery County IFBConstruction - Heavy & CivilBorough of Lansdale
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Borough of Lansdale (Pennsylvania) posted this IFB on Nov 2, 2026. Responses are due Nov 25, 2026. Category: Construction - Heavy & Civil. Solicitation number Borough of Lansdale, Montgomery County.

Solicitation details

General information

Solicitation number
Borough of Lansdale, Montgomery County
Notice type
IFB
Place of performance
Pennsylvania

Agency and category

Agency
Borough of Lansdale
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Borough of Lansdale is undertaking sanitary sewer rehabilitation along N. Cannon Avenue and Poplar Street within the Borough limits. A portion of the funding for this project will be provided through the Pennsylvania Infrastructure Investment Authority (PENNVEST) Funding Program. In general, the work consists of but is not limited to: open cut replacement and cured-in-place pipe (CIPP) lining of the sanitary sewer mains, replacement of sanitary sewer laterals with SDR-26 PVC sanitary sewer laterals including new PVC wye connections to the main, manhole frame and cover replacement, lining of existing sanitary manholes, new cleanouts for all new PVC laterals, inlet top replacements, concrete curb and sidewalk restorations, and permanent pavement restorations.

Scope

Base Bid

Base Bid – N. Cannon Avenue from the railroad tracks adjacent to W. Fifth Street to W. Eighth Street.

  • Replace sanitary sewer main where indicated on the project plans.
  • Replace sanitary sewer laterals within the project limits, including wye connections to the main for all sanitary laterals along mains that are to be lined.
  • Install new sanitary sewer cleanouts for new laterals, 1' behind the face of curb, for each new lateral.
  • Install Cured-In-Place Resin Impregnated Liner as shown on the project plans and re-instate all active sanitary sewer laterals after lining.
  • Replace frames and covers for sanitary manholes within the project limits, as shown on the plans.
  • Install a monolithic multi-layer/component manhole lining system to provide infiltration and corrosion protection.
  • The Contractor shall restore all disturbed concrete sidewalk and curb areas where indicated on the project plans or as directed by the Engineer.
  • Remove temporary paving restorations from all trenches and excavated areas N. Cannon Avenue between the railroad tracks and Eighth Street. and install a six inch (6") thick Superpave Asphalt Base Course, 25MM, PG 64S-22, 0.3 to 3 Million ESALS.
  • The Contractor shall provide record documents to the Engineer/Borough prior to project closeout.

Alternate Bid No. 1

Alternate Bid No. 1 – Poplar Street from Valley Forge Road to Edgemont Avenue.

  • Install Cured-In-Place Resin Impregnated Liner on sewer main between manholes A1-09 and A1-09A.
  • The Contractor shall replace existing inlet tops with Type C Alternate Inlet Tops, including all materials, adjustments, and assembly required for a complete installation, where indicated on the project plans.
  • The Contractor shall perform excavation, place and compact AASHTO No. 10 stone bedding and backfill, install red warning tape, place and compact stone subbase, and perform permanent pavement restorations for the installation of new electrical conduits in the street.

Additional information

All base bid and all alternate bid work awarded must be 100% completed by the Contractor within the contract time limit of 90 calendar days. The contract time limit shall begin once the written Notice to Proceed order has been issued to the contractor.

The Contractor shall supply required insurance, performance and payment bonds.

A pre-construction meeting will be **mandatory**, and the Contractor's on-site paving foreman must attend.

Lansdale Borough reserves the right, in its sole discretion, to determine if a contractor is responsible.