Rebid of WCTA Fuel System Installation - WCTA PA 2026-1.1GC – General Construction

Active Washington County Transit Authority, PA IFBConstruction - Heavy & CivilWashington County Transportation Authority
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Washington County Transportation Authority (Pennsylvania) posted this IFB on Oct 28, 2026. Responses are due Nov 18, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-09 12:00. Solicitation number Washington County Transit Authority, PA.

Solicitation details

General information

Solicitation number
Washington County Transit Authority, PA
Notice type
IFB
Place of performance
Pennsylvania
Questions due
2026-11-09 12:00

Agency and category

Agency
Washington County Transportation Authority
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Notice is hereby given, Washington County Transportation Authority dba Freedom Transit located in Washington, PA, is soliciting bids for the construction of a Fuel System at the new WCTA Operations Facility located at 375 Berry Road, Washington, PA 15301.

Bid packages will be received for the following contracts:

- Contract WCTA PA 2026-1.1GC – General Construction

Scope

Notice is hereby given that Freedom Transit receive bids electronically, ONLY. Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com) by the date and time indicated in the Invitation for Bids along with the Bid security and the other documents required to be submitted as identified herein for bidding the Fuel System Installation WCTA Operations Facility as described within the Contract Documents.

Additional information

Bidding documents are available at no cost via the PennBid Program (https://pennbid.bonfirehub.com).

The deadline for bid submissions is **2:00PM (EST) on November 18, 2026**. All bids will be submitted **electronically** (https://pennbid.bonfirehub.com). Any bids received after that time will be considered non-responsive.

Federal Prevailing Wage Rates are required for this project. This project will require Federal Davis-Bacon prevailing wage rates.

The bidder agrees that bids will be valid for at least a ninety (90) day period from the date the bids are opened.

A bid guarantee from each bidder equivalent to five percent of the bid price is required. A performance bond on the part of the contractor for 100 percent of the contract price. A payment bond on the part of the contractor for 100 percent of the contract price.

Bids or offers that are not accompanied by a completed Buy America certification will be rejected as nonresponsive.

Documents

7 files

Sign up free to get these 7 documents.

  • DBA Rates - WCTA Fuel System Installation.pdf
    Download
  • WCTA Fuel System - AIAs Compiled - RE-BID.pdf
    Download
  • WCTA Fuel System - Attachments Compiled - RE-BID.pdf
    Download
  • WCTA Fuel System Installation - Div 00 - RE-BID.pdf
    Download
  • WCTA Fuel System Installation - Div 01 - RE-BID.pdf
    Download
  • WCTA Fuel System Installation - Drawings.pdf
    Download
  • WCTA Fuel System Installation - Specifications.pdf
    Download

Similar open bids

In Pennsylvania