WC2608 SWOPE Stormwater Basin Retrofit Project

Active West Chester University, Chester County IFBConstruction - Heavy & CivilWest Chester University
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

West Chester University (Pennsylvania) posted this IFB on Oct 30, 2026. Responses are due Nov 20, 2026. Category: Construction - Heavy & Civil. Solicitation number West Chester University, Chester County.

Solicitation details

General information

Solicitation number
West Chester University, Chester County
Notice type
IFB
Place of performance
Pennsylvania

Agency and category

Agency
West Chester University
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Work shall consist of clearing and demo, erosion and sediment controls, basin regarding, underdrain system, outlet structure replacement, drainage structures and piping, gabion basket forebay, amended soil installation, and other work as shown in the Contract Documents. Work included under this Project consists of the retrofit of an existing detention basin, to include clearing and grubbing, the installation of amended soils and an underdrain, an outlet structure, and outlet structure piping to connect to the existing storm sewer within East Campus Drive.

Scope

Work shall consist of clearing and demo, erosion and sediment controls, basin regarding, underdrain system, outlet structure replacement, drainage structures and piping, gabion basket forebay, amended soil installation, and other work as shown in the Contract Documents.

Work included under this Project consists of the retrofit of an existing detention basin, to include clearing and grubbing, the installation of amended soils and an underdrain, an outlet structure, and outlet structure piping to connect to the existing storm sewer within East Campus Drive.

Additional information

**Contract Time:** December 7, 2026 - July 3, 2027; 208 Days

**Prevailing Wages:** Yes; The Prevailing Minimum Wage Determination for this Project is serial number 26-07767, Date: 08/25/2026, classification; Highway

Liquidated Damages: No

Contract Cost Ranges: WC2608.1 General Construction **$450,000** to **$550,000**

Documents

4 files

Sign up free to get these 4 documents.