Porter-Tower Joint Municipal Authority (Pennsylvania) posted this IFB on Oct 30, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Questions are due Seven (7) days prior to the date for receipt of bids, via the "Messages/Vendor Discussions" feature in PennBid. Solicitation number Porter-Tower Joint Municipal Authority, Schuylkill County.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The project generally consists of the addition of a new influent wet well Jockey pump with Variable Frequency Drive in the Operations building. Work includes piping, panel modification, process instrumentation and SCADA integration, as specified herein and as shown on the Drawings consisting of demolition, structural, process mechanical, electrical demolition and electrical.
The project generally consists of the addition of a new influent wet well Jockey pump with Variable Frequency Drive in the Operations building. Work includes piping, panel modification, process instrumentation and SCADA integration, as specified herein and as shown on the Drawings consisting of demolition, structural, process mechanical, electrical demolition and electrical.
Contract No. 01 - General/Process Mechanical
Contract No. 02 - Electrical
Bids for the construction of the Project will be received electronically via the PennBid Program on **Wednesday, December 16, 2026 at 12:00 PM**. [...] Bidders shall complete the electronic bid form within PennBid ("Prepare Your Submission" tab), inclusive of all pricing items and required supporting documents as identified. [...] Bids, inclusive of bid security, and all documents required to be submitted with bids, shall be submitted electronically via the PennBid Program ("Prepare Your Submission" tab).
Attendance at the pre-bid conference is **mandatory**. [...] Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas.
A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions.
Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project. [...] Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012.
Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States.