RFB 2026-062 District 3 Operational Street Maintenance & Pavement Rehabilitation Follow Solicitation

Active RFB2026-062 IFBConstruction - Heavy & CivilCity of Waco
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Waco (Texas) posted this IFB on Nov 4, 2026. Responses are due Dec 18, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-02 17:00. Solicitation number RFB2026-062.

Solicitation details

General information

Solicitation number
RFB2026-062
Notice type
IFB
Place of performance
Texas
Questions due
2026-12-02 17:00

Agency and category

Agency
City of Waco
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Waco District 3 Operational Street Maintenance & Pavement Rehabilitation project generally consists of concrete and street improvements, including but not limited to ADA ramps, sidewalk, curb and gutter, drive approaches, concrete fillets, concrete valley gutters, base failure repairs, asphalt pavement milling/overlaying, and all necessary components as shown on the project drawings and as specified herein.

"Project" refers to construction work that the City seeks to complete and which is named on the cover sheet. The Selected Firm will furnish all labor, materials, equipment, and other incidentals necessary for the successful completion of this construction work.

Scope

The City of Waco District 3 Operational Street Maintenance & Pavement Rehabilitation project generally consists of concrete and street improvements, including but not limited to ADA ramps, sidewalk, curb and gutter, drive approaches, concrete fillets, concrete valley gutters, base failure repairs, asphalt pavement milling/overlaying, and all necessary components as shown on the project drawings and as specified herein.

  • Engineering Estimate: **$3.3M**, Base Bid and Alternate 1 Bid.
  • Liquidation fee - **$2,500** beyond substantial completion and **$1,000** beyond final completion.
  • TxDOT Qualification is NOT required for this bid.
  • Prime Contractor is **required** to self-perform 30% of the contract work.
  • Detailed specifications are attached as Appendices.

The City of Waco is seeking to have the work that is the subject of this RFB to be completed within 220 Calendar days - Substantial Completion / 250 Calendar Days - Final Completion. from the date of the Notice to Proceed.

Additional information

Submission method

Contractors should submit their bids through the City of Waco's eProcurement portal at waco-texas.bonfirehub.com/login. Paper/Physical submissions will still be accepted and should include one (1) electronic copy (CD or Flash Drive) and (1) original and two (2) copies of their statements of qualifications on 8 ½ x 11 paper.

The City will NOT accept a response submitted by facsimile transmission (fax) or by electronic mail (email).

Bid security

Each submission must be accompanied by a certified check of the submitter, or a bid bond (PDF copy through the eProcurement portal) executed by the submitter as principal and having as surety thereon a surety company approved by the City in the amount of **5%** of the submission. The Surety's Power of Attorney must accompany the bid bond.

Award

For this solicitation, the City will award the contract to the Lowest Responsible Bidder. The contract will be awarded to the lowest responsible bidder based on the base bid plus any selected alternatives provided the amount does not exceed the funds then estimated by the City as available to finance the contract.

A submission responding to this RFB signifies the vendor's agreement that the submission, and the content thereof, are valid for ninety (90) days following the submission deadline unless otherwise agreed to in writing by all parties.

Documents

3 files

Sign up free to get these 3 documents.

  • ESBD_573390_1793806133896_RFB 2026-062 Bid Package.pdf
    Download
  • ESBD_573390_1793806193527_RFB 2026-062 Plans - Link.pdf
    Download
  • ESBD_573390_1793806231070_RFB 2026-062 Zoom Information.pdf
    Download

Similar open bids

In Texas

More from City of Waco

Open bids