Utah Division of Facilities Construction and Management (Utah) posted this ITB on Nov 12, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Questions are due 2026-12-03 15:00. Solicitation number DA27018.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Mechanical Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.
Brief Project Description: We will be replacing the 175 Ton air cooled chiller with two 90 Ton air cooled chillers.
Construction Budget:** **$550,000.00
The Contractor shall furnish all necessary labor, materials, equipment, engineering, rigging, permitting, and supervision required to decommission and remove the existing air-cooled split chiller system and install two (2) new, high-efficiency packaged air-cooled chillers at the Mountainland Technical College Provo facility. The scope encompasses all associated structural support modifications, electrical infrastructure upgrades, and hydronic piping reconfigurations. The Contractor is responsible for adding the correct amount of glycol to the chilled water loop, and fully integrating the new chillers into the existing Utah Yamas StruxureWare head end.
**Additive Alternates:** N/A
Additional Project Notes / Risk Factors
Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. [...] After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.
A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P.
All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule (**Friday, December 18, 2026, 3:00 PM**).
The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of **100% of the Contract Sum**. [...] The bonds are to be emailed to dfcmcontracts@utah.gov within ten (10) business days of receipt of the Contract for signature.
**Substantial Completion Date:** May 7, 2027. **Liquidated Damages:** $1,500.00 per day.
A **mandatory** meeting will be held; all prime Contractors wishing to bid on this project must attend and sign in.
Subscribe to get these 11 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.