DFCM Construction - Prequalified MECHANICAL Stage II - MTECH Provo Campus - Chiller Replacement - 27130260

Active DA27018 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Nov 12, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Questions are due 2026-12-03 15:00. Solicitation number DA27018.

Solicitation details

General information

Solicitation number
DA27018
Notice type
ITB
Place of performance
Utah
Questions due
2026-12-03 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Mechanical Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.

Brief Project Description: We will be replacing the 175 Ton air cooled chiller with two 90 Ton air cooled chillers.

Construction Budget:** **$550,000.00

Scope

The Contractor shall furnish all necessary labor, materials, equipment, engineering, rigging, permitting, and supervision required to decommission and remove the existing air-cooled split chiller system and install two (2) new, high-efficiency packaged air-cooled chillers at the Mountainland Technical College Provo facility. The scope encompasses all associated structural support modifications, electrical infrastructure upgrades, and hydronic piping reconfigurations. The Contractor is responsible for adding the correct amount of glycol to the chilled water loop, and fully integrating the new chillers into the existing Utah Yamas StruxureWare head end.

**Additive Alternates:** N/A

Additional Project Notes / Risk Factors

  • The Building is occupied. Contractor needs stay within the boundaries of the Project Scope. Please do not wander the building as it can interrupt Students and Staff.
  • Normal Work Hours: Monday through Friday 8:00 a.m. to 5:00 P.M. After hour work must be approved by Blake Hendry and building security.
  • Contractors will need to check in/out with building security each day.
  • Do not interrupt utilities serving the facility without MTECH and DFCM approval.
  • Interior Elevators are not to be used by the contractor. The back stairwell will be the contractors access to the roof.
  • The roof is new, any work involving the roof must be completed by the roofing contractor that holds the warranty.
  • The contractor must protect the roof in the work / staging areas so the roof membrane isn't damaged. Any damage to the membrane roof will be fixed by the roofing contractor and charged back to the contractor.
  • There is a small parking and staging area behind the building. It is up to the contractor to manage activities in this area. Additional parking is available on the street and public parking garages.

Additional information

Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. [...] After the bid deadline listed on the Solicitation Schedule has passed, the bid tabulation will be available in U3P and the Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P.

All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by the time and date specified on the Solicitation Schedule (**Friday, December 18, 2026, 3:00 PM**).

The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond forms in the amount of **100% of the Contract Sum**. [...] The bonds are to be emailed to dfcmcontracts@utah.gov within ten (10) business days of receipt of the Contract for signature.

**Substantial Completion Date:** May 7, 2027. **Liquidated Damages:** $1,500.00 per day.

A **mandatory** meeting will be held; all prime Contractors wishing to bid on this project must attend and sign in.

Documents

11 files

Subscribe to get these 11 documents.

  • 1-DA27018-27130260 Solicitation.pdf
    Download
  • 2-DA27018-27130260 Approved Drawings.pdf
    Download
  • 3-DA27018-27130260 Approved Specifications.pdf
    Download
  • 4-DA27018-27130260 Approved Structural Calculations.pdf
    Download
  • 5-DA27018-27130260 Approved Chiller System Replacement Detail.pdf
    Download
  • 6-DA27018-27130260 Hazmat Report
    Download
  • 8.2026.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download