Henry County (Georgia) posted this ITB on Oct 28, 2026. Responses are due Nov 25, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-12 15:00. Solicitation number OpenGov-00f820ea.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The intent of this invitation is to obtain competitive sealed bids from qualified vendors for the removal of existing storm drain pipe and installation of new storm drain pipe in three locations identified in the Grove Pointe Subdivision located in Locust Grove, Georgia.
The Contractor shall furnish all labor, materials, equipment, and services required to fulfill the terms and conditions of this bid. Bids will only be considered by those bidders and subcontractors currently pre-qualified with the Georgia Department of Transportation.
Replace existing pipe at the 3 locations identified below with the following:
| Location/Address | Pipe Size | Pipe Type | Pipe Length |
| --- | --- | --- | --- |
| 200 Grove Pointe Drive | 36” | Corrugated Metal Pipe (CMP) | 60 Linear Feet (LF) |
Submission
Bids may be submitted by mail, common carrier or delivered in person. Electronic bids are to be submitted through the County’s eProcurement Portal at (https://procurement.opengov.com/portal/henryga). Emailed or faxed bids will not be considered.
The bid must be submitted in a sealed envelope/parcel on or before **3:00 PM on November 25, 2026** and is to be mailed or delivered to Henry County Purchasing Department, 140 Henry Parkway, McDonough, GA 30253.
The following items are to be included if the bid is submitted by mail, common carrier or delivered in person:
The bid will be awarded to the lowest responsive, responsible Bidder(s), if awarded.
This project has a five (5) percent subcontracting benchmark, which means the Bidder must utilize, or make a good faith effort to utilize, certified M/WBE’s.
Contract Term – The time period of the agreement, if any is formed from this bid, will be determined after the review and evaluation of the Time Line Schedules submitted by the successful Consultant.