Sandy City (Utah) posted this RFP on Nov 3, 2026. Responses are due Nov 23, 2026. Category: Architecture & Engineering. Questions are due 2026-11-20 15:00. Solicitation number GJ27-127.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Sandy City is soliciting proposals from professional consulting engineering firms to provide innovative general engineering services for water and storm water projects for Sandy City. The intent is to enter into a two year contract with two or more engineering firms that can provide services for all types of projects listed below where the total engineering fees are less than $150,000.00.
General Engineering Services for Sandy City Public Utilities’ Water and Storm Water may include, but is not limited to, the following tasks:
The Consulting Engineering Firm(s) selected shall assist the Sandy City Public Utilities Department in design of water and storm water improvements, project management, inspection, water rights, source development, environmental assessments, water and storm water system modeling, and other water and storm water related projects.
The Scope of Work may include the following:
Proposals shall be uploaded into the Sandy City's online bidding portal, IonWave.
Proposals shall be limited to ten (10) pages plus resumes, supportive information in an Appendix as an attachment. Do not include pricing in your proposal. The process of award will be by committee. The committee will base their evaluation on the criteria listed below then apply a score based on the weighted value of that criteria, total of 100 points available.
A selection committee made up of Sandy City staff will review proposals, negotiate with top ranked proposer(s) and recommend successful consultants to the Public Utilities Director for final approval.
Sandy City will enter into a professional Engineering Services Agreement with the selected consultants. A sample of the agreement is attached. Exceptions or deviations to any of the terms and conditions must be submitted in a separate document accompanying consultant's proposal identified as "Exceptions."
Any Addenda for this solicitation will be posted on the sandycity.ionwave.net/login.aspx website and in the Utah Public Procurement Place (U3P). Offerors shall acknowledge Addendum(s) in their proposal response.
Sign up free to get this document.